Self-leveling epoxy floor intermediate paint

1, product description
Jinling brand self-leveling epoxy floor intermediate paint is a solvent-free, self-leveling, particle dense, high-viscosity epoxy floor coating.
2, design use
As a middle layer of protective coatings in environments with severe corrosion, vehicle traffic, chemicals, etc., it is used for ground protection in factories, warehouses, garages, etc.
3, physical parameters
No. project Indicators
1 Paint surface Half light
2 colour Gray (Other colors available on request)
3 Volume solids 100%
4 Theoretical coating rate 2 liters/meter 2 (measured as 2 mm dry film)
5 Flash point 100℃
6 Weight About 1.2 kg/l
7 Touch dry 24 hours
8 Fully cured 7 days
9 Storage stability 1 year (20°C)
10 With force level ≤ 2
11 Flexibility mm ≤ 3
12 Anti-impact kg. Cm ≥ 30
13 Acid resistance (165um lO%H2S04 liquid) 72h coating no change
14 Alkali resistance (165u m 10% NaOH solution) 72h coating no change
15 Pencil hardness ≥ 2H
16 Wear resistance (750g, 300 rpm) weight loss g gas ≤ 0.040
(four) construction instructions
Items Instructions
The mixing ratio Base: Curing Agent: Aggregate=10.5:4.5:18 (by weight)
Validity period 1 hour (20°C, 10 liters)
Construction Tools rake、Bubble roller
Tool cleaning Special thinner
Film thickness Wet film: 2mm Dry film: 2mm
Recoating Minimum: 36 hours (20°C) Maximum: 4 days (20°C)
Construction Conditions In the construction and curing, the ambient temperature should exceed 10 °C, the paint temperature is best around 15 °C, and condensation should be avoided before and after construction and construction.
 
 
 
Construction method
It is best to use a low-speed stirrer when mixing. The mixing step is:
1. First base material into the container;
2. Add the aggregate while stirring;
3. Finally add the curing agent.
After mixing for 10 minutes at low speed, the product can be applied. Considering the approximate ratio between the number and the area, the product is turned to the ground, using a tweezers with triangular teeth, depending on the thickness of the paint film. After 30 to 45 minutes of application, use a defoaming roller to remove residual air. When walking on this coating, special spikes are required to be worn.
Prepainting Jinling brand closed primer
After paint Add self-levelling epoxy floor finish.
4,Remarks
This product is for professional use only.
5,Notes
The relevant data of this manual is obtained under standard conditions. In actual use, the environmental conditions may be slightly different. If there is any change in the above data, the latest specifications of the company shall prevail without notice.