Here is
             Kailin Advanced Material Co.,Ltd.
       Professional  efficient modern environmental
ou want to say or what you want to express.
Marine paint
You are here: Home » Marine paint
Product Detail
Share to:

JLH703 Epoxy iron oxide red shop primer

 
Introduction 2K epoxy iron red shop primer comprising epoxy resin, polyamide curing agent and iron oxide red, etc.
Applications Used as shop primer for pretreating line of shipbuilding, heavyduty machinery plant and steel structure 
factory, etc. The maintenance 
period is 3~6 months.
Properties Good rust resistance, maintenance period is 3~6 months when the dry film thickness (DFT) is 25 μ m; 
excellent welding and cutting 
performance; excellent solvent and water resistance; adhesion and impact
 resistance; good compatibility performance.
Film thickness
and     spreading
rate
DFT:25μm               Theoretical spreading rate:102g/ m2         WFT: 89μm
Physical
performance
Appearance:matt and iron red
Volume solid:28±3%(after blending)
Flash point(Part A and Part B): 5℃
Curing time: (after blending) (25℃)      30min
Viscosity: 30~60 s
Surface
pretreatment
Sandblasting to Sa2.5 as described in ISO standard, and surface  roughness between 40 -70μm; or St2 for surface treatment is required if using power tool.
Applicatio
parameters
ratio: A: B =5:2 (by weight)
Coating method
Airless spraying:   recommended conditions: inlet pressure:
4~5kgf/ cm 2, compression ratio: 1:65,
Type of nozzle: flow / spraying width --special nozzle
Brushing : A precoating or small area of painting is recommended, but the dry film thickness must    
meet the specified requirements.

Roller coating:    Can be used in a small area of painting, but the dry film thickness must   meet the specified requirements.
Thinner:    epoxy shop primer thinner JL106
Pot life :    25℃/8h
Recommended coating layer(s):    1 layer, with its DFT 25μm
Drying process
Substrate
temperature
Touch dry Hard dry
( heating
at 120℃)
recoating interval
shortest longest
5℃ 30min 5 min
20℃ 8 min 5 min
30℃ 4 min 5 min
 
Application
conditions
The substrate temperature≥ 5℃ and at least 3℃ higher than the dew point of the air temperature; 
The temperature and relative humidity 
shall be measured nearby the substrate to be coated;     
relative 
humidity ≤ 85%;Good ventilation is required useful for film drying process.
Typical coating
compatibility
Good compatibility with other coatings system based on chlorinated rubber, epoxy, epoxy asphalt, 
asphalt, epoxy ester, phenolic resin 
and alkyd.
Storage The product must be stored under standard conditions as described by related state regulations, 
wherein the environment must be dry,
cool, well ventilated and away from heat and/or fire. 
The packaging 
containers must be kept sealed.
Load and
unload
Cautious operation; Stir well before use.
Packaging
specifications
A (binder)                            20L/16kg
B (curing agent)               10L/6.4kg
Health           and
safety
Please note the warning logo labeled on packaging container and operate in a circumstance with good ventilation, 
avoid swallowing 
or inhaling paint mist, avoid skin contact or use suitable detergent, soap and water to clean
immediately if the paint splashed on the skin,
and use flowing clean water to rinse eyes if splashed, or carry on
medical care immediately. For more details about health and safety as well as the cautions of the product, 
please refer to our "product 
safety manual" MSDS.
Claim The information given on this product manual is derived from experiments and practical applications. We only
guarantee the 
quality of the said product since conditions of use are beyond the,manufactures control.
Wereservetherights to revise the 
specifications of the product without prior notice.