project | Explain |
composition performance use Coating method Thinner Construction viscosity Coating thickness Usage amount Matching ratio Aging period Applicable period Painting interval Relative humidity After the matching paint Storage period |
The coating is mainly composed of alkyl silicate, ultra-fine zinc powder, pigment filler, special auxiliaries, curing agent and the like. Two-component packaging. Has excellent electrical conductivity and heat resistance, sudden temperature change, and has the advantages of fast drying, strong adhesion, easy construction and so on. Suitable for metal tank static primer and blast furnace hot blast stove outer wall and chimney, flue, drying tunnel, exhaust pipe, high temperature hot gas pipeline heating furnace, and other metals require high temperature anti-corrosion equipment special primer and shop primer . Brush, roller, spray. H06-7 special thinner Brush for 25-30 seconds Spray 15-20 μm/channel Brush 20-25um/channel, spray 15-20 microns/channel Brushing 140 to 170 g/m2, spraying 150 to 180 g/m2 Group A: Group B = 4:l 20 minutes 8 hours The shortest 5 hours The longest 24 hours Less than 85% H06-7 anti-static anti-static special anti-corrosion coating for metal oil tanks, H06-3 epoxy anti-corrosion paint cloud iron, a variety of epoxy topcoats, WEH88 series silicone high temperature finish. 12 months |
project | index | Detection method | |
Exterior | gray | Visual inspection | |
Viscosity (coating a 4 cups) S ≥ | 25 | GBl723—79 | |
Adhesion level ≤ | 2 | GBl720一79 | |
Flexibility mm ≤ | 3 | GBl73l一79 | |
Drying time H (23±2℃) | Dry ≤ | 0.5 | GBl728一79 |
Hard work ≤ | 12 |
project | index | Detection method | |
Exterior | gray | Visual inspection | |
Viscosity (coating a 4 cups) S ≥ | 25 | GBl723—79 | |
Adhesion level ≤ | 2 | GBl720一79 | |
Flexibility mm ≤ | 3 | GBl73l一79 | |
Drying time H (23±2℃) | Dry ≤ | 0.5 | GBl728一79 |
Hard work ≤ | 12 |