Here is
             Kailin Advanced Material Co.,Ltd.
       Professional  efficient modern environmental
ou want to say or what you want to express.
ZH04 floor coating
You are here: Home » ZH04 floor coating
Product Detail
Share to:

Epoxy floor intermediate paint

1, product description
Jinling brand epoxy floor paint is a two-component epoxy paint, the film is dense, hard, and small shrinkage.
2, design use
This product is used as the intermediate paint of epoxy floor coating series, applied on the sealer primer or putty to increase the thickness of the paint film and the flatness of the coating. It can also be used as a semi-matt finish.
3, physical parameters
No. Items Indicators
1 Paint surface Low gloss
2 colour Various colors
3 Volume solids About 59%
4 Theoretical coating rate About 4.0m2/l (dry film 150 micron meter)
5 Flash point 26℃
6 Weight About 1.5 kg/l
7 Touch dry 4 hours (20°C)
8 Fully cured 7 days (20°C)

4,Construction instructions
Items Explain
The mixing ratio Base: Curing agent = 25:3:5 (mass ratio)
Construction method Airless spray Brush
Dilute agent Special thinner Special thinner
The largest amount of use 5% 5%
Mixed use time 8 hours (20°C)
Spray hole 0.018—0.021”
Spray pressure 200 kg/cm2 (Airless spray data is for reference only, it can be adjusted when it is practical)
Tool cleaning Special thinner
Film Thickness Wet film: 250 microns Dry film: 150 microns. (See "Remarks")
Recoating Minimum: 24 hours (20°C) Max: see note
Construction Conditions The construction surface should be clean and dry. The surface temperature should be higher than the dew point to avoid condensation. The use of curing agent for summer use at a temperature of 10° C. or more allows the application and curing to proceed normally, and is preferably 15° C. or more. When using winter curing agents, the temperature is required to be above 10°C. The floor surface temperature must also exceed this limit. It should be noted that freezing or any temperature below it will freeze the surface and affect the adhesion of the paint film. The temperature of the paint itself should be higher than 15°C to ensure normal construction performance. During the construction and drying of narrow spaces, ventilation should be extensive.
Paint first Jinling closed paint or batch scraper.
Add paint Jinling epoxy floor coating topcoat.
5, note
The film thickness can be adjusted as needed, but this will change the coating rate and affect the drying time. When the film is exposed to immersion, heavy fog, large temperature differences, chemical attack or abrasion during use, the maximum recoating interval does not exceed 30 days. If the surface is contaminated, rinse thoroughly with high pressure fresh water before recoating and allow it to dry. If the maximum recoating interval is exceeded, the rough surface must be ground to ensure adhesion between the films.
6, note
This product is for professional use only.
7, security
The safety regulations of the relevant national and local governments must be observed and the safety notes on the packaging labels must be observed. Strengthen ventilation facilities. Wear protective masks during construction to avoid inhalation of solvent vapors and avoid contact with important parts such as skin and eyes. Precautions must be taken to prevent fire and explosion.
(8) Notes
The relevant data of this manual is obtained under standard conditions. When it is actually used, the environmental conditions may be slightly different from the above. If any of the above data is changed, the latest manual of the company shall prevail, without prior notice.